Gilboa PSP This is a current on-going project of a power plant construction that allows the energy storage by pumping water from a low-level reservoir to a high-level reservoir. The height difference between the two reservoirs is 574 meters.
TFI – Tunnels & Formworks International contributed in the design and realization of the works